A shed used for storage and a garage used as a workshop need different electrical plans. Guardian brings power to detached structures and installs the agreed lighting, outlets and equipment connections around how you will use the space.
On this page: Project details · Common questions
Review the plans and intended use
Walk through the construction or renovation scope, equipment loads and desired outlet, switch and lighting locations.
Coordinate rough-in and finish work
Plan wiring routes and project stages around framing, other trades and access. Define what is included in electrical work and any separate finish repairs.
Confirm scope, permits and scheduling
We identify permit and inspection requirements for the property jurisdiction. Utility coordination is included when the work affects its equipment or supply. You receive the proposed scope before approving the work.
Complete the work and check operation
We complete the agreed electrical work, test the relevant installation and explain operation, findings and any follow-up. Required official inspections are a separate part of completion.
Explain whether the space needs basic lights and convenience outlets, tools, a refrigerator, heating and cooling equipment or another specific load. Send model or nameplate information for equipment you already own. A general wish for more power is less useful than a list of what may operate together.
If you are changing an existing shed or garage, identify the current supply and the new use. An existing outlet does not show what additional equipment it can support. Guardian reviews the proposed demand and installation before recommending a circuit arrangement or any related equipment changes.
Distance, accessible routing, paving, landscaping and other work planned for the property affect the installation. Share a simple sketch showing the main building, detached structure and approximate path. Let us know about new driveways, patios or foundations so electrical planning can happen before access is restricted.
The existing electrical supply matters as much as the new building. Additional panel spaces and additional service capacity are different questions. Depending on the intended use and site, the project may involve a circuit, a feeder and subpanel, or other changes established during review; there is no one-size package for every garage.
Plan bench positions, storage, door movement, switch locations and overhead lighting before choosing outlet locations. If walls are open now but will be finished later, discuss that stage early. Include outdoor receptacles or lighting only where they are part of the agreed scope.
Costs depend on equipment demand, route length, access, trenching or surface-restoration arrangements, interior finish and the existing supply. Identify who handles work outside the electrical installation. For an occupied property, discuss access and any interruptions at the main building as well as the work in the new structure.
A small shed with limited lighting and receptacle needs may have a different supply plan from a workshop running several tools, a compressor and heating or cooling equipment. A branch circuit supplies its connected loads. A feeder and subpanel can distribute power to multiple circuits at the detached building. The intended loads and property conditions determine which arrangement fits.
Adding a subpanel does not create more capacity in the property’s electrical service. Guardian reviews the existing demand, proposed loads and the route before recommending equipment. Detached-building grounding, bonding and disconnecting arrangements are considered as part of the complete installation, not left until the interior outlets are finished.
No. It provides distribution for circuits at the garage, within the capacity available from the existing supply. The house service, feeder and planned equipment loads must all be evaluated.
The equipment’s voltage, current and operating needs determine the circuits. Several tools operating together can change the supply needed. We review the actual equipment list and avoid assuming every workshop needs the same installation.
Yes. The route from the existing supply and the shed’s intended use form the starting point. A suitable new supply is assessed rather than extending an existing outdoor outlet without reviewing its capacity and protection.
Yes. Coordinate the route before paving, foundations or landscaping restrict access. The final route and any excavation or restoration responsibilities are established for the property.
Guardian offers free quotes for planned projects. A fault-finding visit or service call can involve a diagnostic charge, explained before booking. Access, equipment requirements and the work identified determine the proposed repair or installation scope.
Share the property address, the problem or project you have in mind, and equipment details when available. Photos of accessible equipment and the work area can help us plan the next step. Do not remove electrical covers or expose wiring to take photographs.
Guardian Electrical Contractors LLC is based in Myrtle Beach and serves Horry and Georgetown counties. SC CLM.119159 · Insured and bonded · Veteran-owned.
Project quotes are free. Diagnostic and service-call charges are explained before booking. Calls are answered 24/7; call to confirm availability and scheduling.
For outdoor work in Surfside Beach, Murrells Inlet or inland communities, describe water exposure, property access and the route from the supply. Include dock, pool, landscaping or outbuilding contractors when their work affects the installation.
Guardian serves Myrtle Beach, Conway, Carolina Forest and communities across Horry and Georgetown counties. See how quotes and diagnostic visits work, our credentials and project planning guides before arranging the next step.